Question: Devise a project schedule for a three bed - roomed two storey apartment using precedence diagram ( activities number must be between 3 0 and
Devise a project schedule for a three bedroomed two storey apartment using precedence diagram activities
number must be between and and repeat in bar chart form using Microsoft Project software. The
building is a reinforced concrete structure of framed type, solid two way slabs, cement blocks for wall
elevation and sitting on pad foundations. The roof is made up of wood trusses covered with metal sheets
IT
Work must include:
Construetion drawings
Construction planning Technology and method statements
Programming and scheduling Time and resource scheduling
Work Breakdown Structure WBS
Final project schedule showing required minimum construction period, including critical path.
Assume own leads and or lags where necessary
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock