Question: Diagnostics using Variability Analysis Situation: Two machines in series; machine 2 is the bottleneck. Machine 1 : 0 = 1 9 mins, 2 = 1

Diagnostics using Variability Analysis
Situation: Two machines in series; machine 2 is the bottleneck.
Machine 1: 0=19 mins,
2=1
MTBF =48,=8
Machine 2: 0=19 mins, 0
2=0.25
MTBF =3.3 hr, MTTR =10 min
Space at machine 2 for 20 jobs of WIP.
Desired throughput 2.4 jobs/hr, not being met.
a) Set up VUT spreadsheet
b) Use a single solution to improve the performance or fix the problem.