Question: Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 196,000 lbs. at $5.30 | 194,000 lbs. at $5.20 | |
| Direct labor | 17,500 hrs. at $18.30 | 17,900 hrs. at $18.60 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 18,260 direct | |||
| labor hrs.: | |||
| Variable cost, $3.80 | $65,840 variable cost | ||
| Fixed cost, $6.00 | $109,560 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Material Price Variance | $fill in the blank 1 | FavorableUnfavorableFavorable |
| Direct Materials Quantity Variance | $fill in the blank 3 | FavorableUnfavorableFavorable |
| Total Direct Materials Cost Variance | $fill in the blank 5 | FavorableUnfavorableFavorable |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Direct Labor Rate Variance | $fill in the blank 7 | FavorableUnfavorableUnfavorable |
| Direct Labor Time Variance | $fill in the blank 9 | FavorableUnfavorableUnfavorable |
| Total Direct Labor Cost Variance | $fill in the blank 11 | FavorableUnfavorableUnfavorable |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $fill in the blank 13 | FavorableUnfavorableFavorable |
| Fixed factory overhead volume variance | $fill in the blank 15 | FavorableUnfavorableUnfavorable |
| Total factory overhead cost variance | $fill in the blank 17 | FavorableUnfavorableUnfavorable |
Feedback Area
Step by Step Solution
There are 3 Steps involved in it