Question: Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Eastern Polymers, Inc., processes a base chemical into plastic. Standard costs and actual costs for
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Eastern Polymers, Inc., processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 5,600 units of product were as follows:
| Standard Costs | Actual Costs | ||
| Direct materials | 7,300 lbs. at $5.00 | 7,200 lbs. at $4.90 | |
| Direct labor | 1,400 hrs. at $17.70 | 1,430 hrs. at $18.10 | |
| Factory overhead | Rates per direct labor hr., | ||
| based on 100% of normal | |||
| capacity of 1,460 direct | |||
| labor hrs.: | |||
| Variable cost, $3.50 | $4,850 variable cost | ||
| Fixed cost, $5.50 | $8,030 fixed cost | ||
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Price variance | $ | Favorable or Unfavorable |
| Quantity variance | $ | Favorable or Unfavorable |
| Total direct materials cost variance | $ | Favorable or Unfavorable |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Rate variance | $ | Favorable or Unfavorable |
| Time variance | $ | Favorable or Unfavorable |
| Total direct labor cost variance | $ | Favorable or Unfavorable |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
| Variable factory overhead controllable variance | $ | Favorable or Unfavorable |
| Fixed factory overhead volume variance | $ | Favorable or Unfavorable |
| Total factory overhead cost variance | $ | Favorable or Unfavorable |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts