Question: Discussion Questions 1. Develop a network drawing for Hill Construction and determine the critical path. How long is the project expected to take? 2. What

Discussion Questions 1. Develop a network drawing
Discussion Questions 1. Develop a network drawing
Discussion Questions 1. Develop a network drawing for Hill Construction and determine the critical path. How long is the project expected to take? 2. What is the probability of finishing in 270 days? 3. If it is necessary to crash to 250 or 240 days, how would Hill do so, and at what costs? As noted in the case, assume that opti- mistic time estimates can be used as crash times. T e y 1 16.4 Maggie Moylan Motorcycle Corp. uses kanbans to sup- port its transmission assembly line. Determine the size of the kan ban for the mainshaft assembly and the number of kanbans needed. Setup cost = $20 Annual holding cost of mainshaft assembly $250 per unit Daily production 300 mainshafts Annual usage 20,000 (= 50 weeks X 5 days each x daily usage of 80 mainshafts) Lead time 3 days Safety stock = day's production of mainshafts PX

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!