Question: do it in excel with formuals . The multinational Zimple manufactures a range of electronic products, including the Zim - K , a popular state

do it in excel with formuals . The multinational Zimple manufactures a range of electronic products, including the Zim-K, a popular state-of-the-art 4K monitor.
Orders for the Zim-K come from online and big-box stores. The factory receives an average of 3 orders a day (Poisson distribution). Each order is routed to one of the factory's production lines. Whatever its size, an order takes an average of 5 days to complete (exponential distribution) on a production line. The factory has 5 permanently activated production lines, and up to 5 more can be activated (total of 10). However, each additional line costs $1,000 per day of operation.
To ensure that monitor components are state-of-the-art, inventory is kept to a minimum. Consequently, the number of orders in queue is limited to a maximum of 30. Each order over the 30th is sent to a subcontractor, at a unit cost of $5,000. In addition, customer contracts stipulate that each day that an order waits to be processed costs $2,500 in penalty charges.
[4 points]
How many additional lines would have to be activated if we wanted to route at most one (1) order per day to a subcontractor?
Hints: Use Scenario 0 row (and others, if necessary) for the initial model. Enter the arrival rate, service rate, # of servers and queue capacity in columns B to E and observe the results.
Think (1): What needs to be changed to model the addition of an extra line?
Think (2): For which values are there 1 order per day sent to the subcontractor?
[2 points]
If they operated with 10 active production lines (i.e.5 additional lines), what would be the total cost per day? Include costs of additional lines, penalty costs and subcontracting costs.
Hints: Use use one or more row(s) for the model. Enter arrival rate, service rate, # of servers and queue capacity in columns B to E. Copy the formulas from F4:M4 to the new rows to obtain the performance measurements. In columns N to P, enter the formulas for each cost component. The Cost:Total (Q) will add them automatically.
[2 points]
Suppose that they have improved their manufacturing process and lowered the average time to complete an order to 4 days. With 10 active production lines, how much will they save?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!