Question: Doakes Corporation uses a work order costing system based on direct labor-hours with a single, predetermined overhead rate throughout the facility. The company has based
Doakes Corporation uses a work order costing system based on direct labor-hours with a single, predetermined overhead rate throughout the facility. The company has based the predetermined overhead rate for the current year on the following data:
| Total direct labor-hour | 60.000 | |||||
| Total fixed overhead cost of production | $ | 378.000 | ||||
| Variable production load per direct labor-hour | $ | 2.20 | ||||
Recently Job M843 has been completed with the following features:
| Number of units in the job | 60 | |||||
| Total direct labor-hour | 120 | |||||
| Direct materials | $ | 630 | ||||
| direct labor cost | $ | 2.400 | ||||
For job M843, find the unit cost of product.
Step by Step Solution
3.36 Rating (159 Votes )
There are 3 Steps involved in it
To find the unit cost of the product for job M843 we need to calculate the total cost ... View full answer
Get step-by-step solutions from verified subject matter experts
