Question: DON'T do this with code Problem 3: (30 Points) Use the dynamic programing method to find the schedule for the following 4 unit system. Assume

 DON'T do this with code Problem 3: (30 Points) Use the

DON'T do this with code

Problem 3: (30 Points) Use the dynamic programing method to find the schedule for the following 4 unit system. Assume the load pattern for 1st two hours is as follows: Hour 1 2 Load (MW) 120 220 Max Min IC No load Start up Shut down Initial Unit MW MW $/MWh Cost/h Cost $ Cost $ Cond. 100 15 100 200 180 90 10 17 100 150 140 80 8 15 100 120 100 -2 4 110 12 11 100 | 80 80 -1 Min up time = 2 hours (all units) , Min down time = 2 hours (all units except unit 4) Min down time for unit 4 = 3 hours 16 1402 Problem 3: (30 Points) Use the dynamic programing method to find the schedule for the following 4 unit system. Assume the load pattern for 1st two hours is as follows: Hour 1 2 Load (MW) 120 220 Max Min IC No load Start up Shut down Initial Unit MW MW $/MWh Cost/h Cost $ Cost $ Cond. 100 15 100 200 180 90 10 17 100 150 140 80 8 15 100 120 100 -2 4 110 12 11 100 | 80 80 -1 Min up time = 2 hours (all units) , Min down time = 2 hours (all units except unit 4) Min down time for unit 4 = 3 hours 16 1402

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!