Question: dont worry about first pic, just need help with second pic You are the cont of schooldre function that every carly stage of prot. The
You are the cont of schooldre function that every carly stage of prot. The schoolbudewletumber of up the cont of a plasmarschalburg was 1,280 What the stated aradores generaryan 1000 a 14.000 69145 0.100 You estimated the cost of a new public building as $1,880,000 based on Sydney cost data. The building will be constructed in Newcastle. If the location cost factors of Sydney and Newcastle are 1.000 and 1.013 respectively, what will be the cost after the location adjustment? A. $1,880,000 B. $1,900,000 C. $1,904,440 D. $1,855,874 You are preparing an elemental cost estimate for a house and you calculate the Elemental Unit Rate (EUR) of the substructure as $85 per m2 based on 2018 cost data. If the Building Cost Index for 2018 is 293 and 2021 is 330, what will be the EUR of the substructure after the time adjustment? CA. $90 per m2 B. $75 per m2 C. $86 per m2 D. $96 per m2
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
