Question: Download the practice exercise document: Practice Exercise 1 - CPA and Crashing Project.docx. Complete the assignment and (make sure including all files) MGT 4330 PM
Download the practice exercise document:Practice Exercise 1 - CPA and Crashing Project.docx.
Complete the assignment and (make sure including all files)


MGT 4330 PM Practice Exercise 1: CPA (Critical Path Analysis) and Crashing Project Q1. Create Network Diagram (2.5pts) A. Draw a network from the following information. Ill Pledecessnl None Im'nmnwb Note: you can use the PowerPoint or Microsoft Project. Watch the PPT for both options include in Week 3 learning Module. B, What type of activity is each of the following? Choose one of the following: neither burst nor merge, or burst, or merge, Activity A Activity 5 Activity c Activity in Autumn] E Activity r Activity 6 Activity H Q2. Crashing Project (2.5pts) Use the information contained below to compress onetime unit per move using the least cost method. Reduce the schedule until you reach the crash point of the network. For each move, identify what activityfies) was crashed and the adjusted total cost. Note: Choose B instead of C and E (equal costs) because it is usually smarter to crash early rather than late AND one activity instead of two activities Crash Cost Maximum Normal Normal AC1. (Slope) Cm 5h Time Time Cost A 0 2 150 B 100 l 3 100 C 50 2 4 200 D 40 l 4 200 E 50 l 3 200 F 0 l 150 C Initial 6 project duration 13 A B F 2x 3 1x D E Total direct cost 1,000 4 3 Note: Watch the step-by-step Video in Week 3- Learning Module Hint: You can reduce the project time from 13 to 10. Remember to show your network and the total project cost for EACH REDUCTION. End of document
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
