Question: draw a human machine chart for one assembly point (workcell). Assume that there are at least two machines, and there is only one operator in
draw a human machine chart for one assembly point (workcell). Assume that there are at least two machines, and there is only one operator in the selected workstation. It takes 1 minute to travel between machines, 4 minutes to load a machine, 1 minute to unload a machine, 6 minutes of automatic machine time and 1 minute to inspect and pack a finished part.