Question: Draw an Activity On Arrow (AOA) network for a project given in the table. Show the project scheduling on a Gantt chart including total float.

Draw an Activity On Arrow (AOA) network for a project given in the table. Show the project scheduling on a Gantt chart including total float. Present the profile of machine requirements for the project. Suggest an appropriate resource leveling if the project have a limitation of 2 machines only. Work in a group of TWO (2) students. Only ONE (1) submission is required. [50 marks] Activity List ACTIVITY LIST Depend Upon Duration Machine Strip room 3 Repair wall and ceiling 1, 5. 7 3 Repair floor 1, 5 4 Lay vinyl floor 3, 12, 13, 14 5 Rough in plumbing and electrical 5 Finish in plumbing and 2, 3, 5, 9, 10, 11, 19 2 electrical Replace existing fume duct 1 Install new fume hood 2, 3, 16 Install 1/3 base cabinet 2, 3, 8, 15 10 Install wall cabinet 2, 3, 7, 15 11 Install chemical sink 2, 3, 5, 9, 17 12 Paint cabinets 6, 8, 9, 10, 11, 18 6 13 Paint walls and ceiling 2, 3, 6, 8, 9, 10, 18 14 Obtain vinyl floor covering 5 15 Obtain cabinet 10 16 Obtain fume hood 10 17 Obtain chemical sink 10 18 Painter availability 20 19 Install 2/3 base cabinet 2, 3, 9, 15 2
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
