Question: Draw the Work Breakdown Structure ( WBS ) Diagram 1 . Project Initiation and Planning 1 . 1 . Obtain approval and sign the contract

Draw the Work Breakdown Structure (WBS)Diagram
1. Project Initiation and Planning
1.1. Obtain approval and sign the contract
1.2. Submit insurance and bond documentation
1.3. Develop and submit project schedule
1.4. Submit values schedule
1.5. Secure building permits and conditions
2. Site Preparation and Foundations
2.1. Site clearing and grading
2.2. Install temporary utilities and site facilities
2.3. Excavation for foundations
2.4. Pour concrete for foundations and piers
2.5. Foundation curing and waterproofing
3. Structural Framework
3.1. Steel and concrete framework construction
3.1.1. Erect steel beams, joists, and columns
3.1.2. Install floor and roof rebar and concrete pour
3.1.3. Cure concrete structures
3.2. Masonry works
3.2.1. Build load-bearing walls
3.2.2. Install non-load bearing walls and partitions
4. Roofing and Exterior Works
4.1. Roof construction and waterproofing
4.2. External wall cladding and insulation
4.3. Exterior painting and finishes
5. Interior Construction and Finishes
5.1. Plumbing and electrical rough-in
5.2. Installation of HVAC systems
5.3. Interior plastering and drywall installation
5.4. Interior painting, tiling, and finishes
5.5. Install fixtures, fittings, and woodwork
6. Installations and Utilities
6.1. Complete mechanical, electrical, and plumbing (MEP) installations
6.2. Install lighting, sockets, and switches
6.3. Install bathroom and kitchen fixtures
7. Final Stages and Commissioning
7.1. Flooring installations
7.2. Install doors, windows, and final hardware
7.3. Testing and commissioning of building systems
7.4. Final inspections and approvals
7.4.1. Building inspector review
7.4.2. Fire safety inspection
7.4.3. Health and safety inspection
8. Project Closeout
8.1. Final cleaning and waste removal
8.2. Punch list completion
8.3. Handover to client and final documentation

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!