Question: Draw the Work Breakdown Structure ( WBS ) Diagram 1 . Project Initiation and Planning 1 . 1 . Obtain approval and sign the contract
Draw the Work Breakdown Structure WBSDiagram
Project Initiation and Planning
Obtain approval and sign the contract
Submit insurance and bond documentation
Develop and submit project schedule
Submit values schedule
Secure building permits and conditions
Site Preparation and Foundations
Site clearing and grading
Install temporary utilities and site facilities
Excavation for foundations
Pour concrete for foundations and piers
Foundation curing and waterproofing
Structural Framework
Steel and concrete framework construction
Erect steel beams, joists, and columns
Install floor and roof rebar and concrete pour
Cure concrete structures
Masonry works
Build loadbearing walls
Install nonload bearing walls and partitions
Roofing and Exterior Works
Roof construction and waterproofing
External wall cladding and insulation
Exterior painting and finishes
Interior Construction and Finishes
Plumbing and electrical roughin
Installation of HVAC systems
Interior plastering and drywall installation
Interior painting, tiling, and finishes
Install fixtures, fittings, and woodwork
Installations and Utilities
Complete mechanical, electrical, and plumbing MEP installations
Install lighting, sockets, and switches
Install bathroom and kitchen fixtures
Final Stages and Commissioning
Flooring installations
Install doors, windows, and final hardware
Testing and commissioning of building systems
Final inspections and approvals
Building inspector review
Fire safety inspection
Health and safety inspection
Project Closeout
Final cleaning and waste removal
Punch list completion
Handover to client and final documentation
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock