Question: Draw the Work Breakdown Structure ( WBS ) Diagram Level 1 : Bungalow House Construction Project Level 2 : Pre - Construction Phase Construction Phase
Draw the Work Breakdown Structure WBS Diagram
Level : Bungalow House Construction Project
Level :
PreConstruction Phase
Construction Phase
PostConstruction Phase
Level PreConstruction:
Project Management and Planning
Development of project charter, scope statement, and plan.
Stakeholder identification and engagement.
Scheduling, budgeting, and resource planning.
Design and Engineering
Architectural design and approval.
Structural, MEP Mechanical Electrical, and Plumbing engineering designs.
Iterations and finalization of designs based on client feedback and regulatory requirements.
Permits and Approvals
Submission of designs to local authorities in Petaling Jaya.
Obtaining necessary construction and environmental permits.
Procurement
Selection and contracting of suppliers and subcontractors.
Purchase of materials and equipment required for the initial stages of construction.
Level Construction:
Site Preparation and Foundation
Site clearing, excavation, and leveling.
Laying of foundation including footings and slab.
Structural Works
Construction of the main frame of the bungalow, including loadbearing walls and beams.
Roofing
Installation of trusses and roofing materials.
MEP Installations
Installation of mechanical systems like HVAC.
Electrical wiring throughout the house.
Plumbing systems installation.
Interior and Exterior Finishes
Plastering, painting, and decorating.
Installation of fixtures and fittings.
Level PostConstruction:
Testing and Commissioning
Systems testing like electrical, plumbing, and HVAC.
Addressing any deficiencies found during testing.
Handover and Closeout
Final inspections and approval from local authorities.
Client walkthrough and handover of the completed property.
Project documentation and closure.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock