Question: Drepte du sect 21 about 2 he work duce n.com%252F#/activity/quest You skicced this question in the previous attempt 2 1 | Perepaired information w following


Drepte du sect 21 about 2 he work duce n.com%252F#/activity/quest You skicced this question in the previous attempt 2 1 | Perepaired information w following into as to the most below! The management of Devine Instrument Company ordering the purchase of a new ding machine model Pobel OK. According to the sosofication and testing resulta Pobel wil substantial increase productivity over XO, the machine Denne curtains The Ae was scored 8 yer age for $80.000 and being depressed wing the right line method Svet 10 year rested and en imated selvage value of $20,000. The engineering department speet the Aeneri tekee going for another yes siera major averhout the end of a speed uue. The stimated cost for the overhaul $100.000. The overhoved machine will be deprecated on wright line depreciation with me selvage value. The overhaul will move the machine's operating efficiency primately 10% to oth of year 34 d 5. Neathe perating conditions will be affected by the over Poberi 1010k saling for $240.000. Installing tingratorging and training will the $20.000. The manufacturer la willing to take the heavila strade-in for 330.000 The Robes will be degreed another line method will nevege value. New technology mostly wil make strani ste te the firm in 5 years Variable beating anferthermochine is the same $11 per machine hou cah-band Other pertinent dan WHICH STAHL MISLI MIR MARIA RENAME MAI GIMTAMINEN Devine natrumeni center vighted average cost of cha WACC) a Bandhan the 40% tax brakes as the DV factor for calculating the Novofcodexo tematie the WWW WIS The management of Cewe Harument Carrey is considering the purchase of a new drilling machine model ari 1000K. According to the profiteraard word dit v D-1X10, the machine Devine is currently ang The Arena orada yange for $20.000 are a being deprecated and the righ-line method avere ur rete tent or extmed vape 520.000 The engineering that so going for the 3 years after a major overhaul at the end of its expected actul life. The stimated cost for the averhaul a $100.000. Thesverhauled machine No other perang terhube affected by the ever had Deboril 10106 assinater 534000.htine, teine engine and valing will cost the $20.000 The manufacturer willing to take the formare 330.000 The bear the tregtimetrodNew technology most likely will make Reberlebaclete to the firm in 5 years Varable aperating cele machines the same $11 ber machine hour bases Other pertinent data folen 1 bespree ALLOW1 19.0 8.00 S 100 Robot 1010 10,000 4.00 $ Units of our Machin huis Solling prior Variable at cash-based (not including machines Other an holl and supervising Disposal and Disposal values $ 20 $40,00 2e Xe, $25,000 S $50,00 Devine Instument Company's weighted average cost of capital WACC) 228 and it in the 40% tax bracket Vas the PV fotonapenex C Teleste celelating the NPV of each dessen eternative Suey Tegelen B S 21x88x C Get Homework Help With Chegg X + Hect_Production/bne/accounting/blocher_8e/Appendix_C_Table_1.jpg LE 1 Present Value of $1 12% eriods 45 5% 6% 79 8% 99 10% 11% 13% 14% 15% 20% 25% 30% 1 0.962 0.952 0.943 0.935 0.926 0917 0.909 0.901 0.893 0.SS5 0.877 0.870 0.333 0.500 0.769 2. 0.925 0.907 0.590 0.873 0.357 0.542 0.526 0.12 0.797 0.783 0.769 0.756 0.694 0.640 0.592 3 0.899 0.364 0.540 0.816 0.794 0.772 0.751 0.731 0.712 0.693 0.675 0.658 0.579 0.512 0.455 4 0.855 0.823 0.792 0.763 0.735 0.70 0.683 0.659 0.636 0.613 0.592 0.572 0.482 0.410 0.350 5 0.822 0.750 0.747 0.713 0.651 0.650 0.621 0.593 0.567 0.543 0.519 0.497 0.402 0.329 0.269 6 0.790 0.746 0.705 0.666 0.630 0.596 0.564 0.535 0.507 0.450 0.456 0.432 0.335 0.262 0.207 7 0.760 0.711 0.665 0.623 0.533 0.547 0.513 0.432 0.452 0.425 0.400 0.376 0.279 0.210 0.159 S 0.731 0.677 0.627 0.582 0.540 0.502 0.467 0.434 0.404 0.376 0.351 0.327 0.233 0.165 0.123 9 0.703 0.645 0.592 0.544 0.500 0.460 0.424 0.391 0.361 0.333 0.305 0.284 0.194 0.134 0.094 10 0.676 0.614 0.558 0.505 0.463 0.422 0.356 0.352 0.322 0.295 0.270 0.247 0.162 0.107 0.073 0.650 0.585 0.527 0.475 0.429 0.333 0.350 0.317 0.287 0.261 0.237 0.215 0.135 0.036 0.056 12 0.625 0.557 0.497 0.444 0.397 0.356 0.319 0.286 0.257 0.231 0.205 0187 0.112 0.069 0.043 13 0.601 0.530 0.469 0.415 0.365 0.326 0.290 0.25% 0.229 0.204 0.182 0.163 0.093 0055 0.033 14 0.577 0.505 0.442 0.385 0.340 0.299 0.263 0.232 0.205 0.151 0.160 0.141 0.078 0.044 0.025 15 0.555 0.451 0.417 0.362 0.315 0.275 0.239 0.209 0.183 0.160 0.140 0.123 0.065 0.035 0.020 16 0.534 0.458 0.394 0.339 0.292 0.252 0.215 0.1SS 0.163 0.141 0.123 0.107 0.054 0.028 0.015 17 0.513 0.436 0.371 0.317 0.270 0.231 0.19 0.170 0.146 0.125 0 105 0093 0.045 0.023 0.012 18 0.494 0.416 0.350 0.296 0.250 0.212 0.180 0.153 0.130 0111 0.095 O OSI 0.038 0.018 0.009 19 0.475 0.396 0.331 0.277 0.232 0.194 0.164 0.13 0.116 0.098 0.083 0.070 0.031 0.014 0.007 20 0.456 0.377 0.312 0.258 0.215 0.178 0.149 0.124 0.104 0.087 0.073 0.061 0.026 0.012 0.005 22 0.422 0.342 0.278 0.226 0.184 0.150 0.123 0.101 0.083 0.06 0.056 0.046 0.014 0.007 0.003 24 0.390 0.310 0.247 0.197 0.158 0.126 0.102 0.082 0.066 0.053 0.043 0.035 0.013 0.005 0.002 25 0.375 0.295 0.233 0.184 0.146 0.116 0.092 0.074 0.059 0.047 0.035 0.030 0,010 0.004 0.001 30 0.308 0.231 0.174 0.131 0.099 0.075 0.057 0.044 0.033 0.026 0.020 0,015 0.004 0.001 0.000 35 0.253 0.151 0.130 0.094 0.06 0.049 0.036 0.026 0.019 0.014 0.010 0.00 0.002 0.000 0.000 40 0.205 0.142 0.097 0.067 0.046 0.032 0.022 0.015 0.011 0.008 0.005 0.004 0.001 0.000 0.000 0231 019 Note: The present value (PV) factor for N periods and rater per period = 1+(1+r)" For example, the PV factor for 10%, 5 years = 1 +(1+0.103* = 0.621 (rounded) w O a 110 18 f9 17 16 + 08 * 7. 9 6 O 8 2 1/4 12 a Drepte du sect 21 about 2 he work duce n.com%252F#/activity/quest You skicced this question in the previous attempt 2 1 | Perepaired information w following into as to the most below! The management of Devine Instrument Company ordering the purchase of a new ding machine model Pobel OK. According to the sosofication and testing resulta Pobel wil substantial increase productivity over XO, the machine Denne curtains The Ae was scored 8 yer age for $80.000 and being depressed wing the right line method Svet 10 year rested and en imated selvage value of $20,000. The engineering department speet the Aeneri tekee going for another yes siera major averhout the end of a speed uue. The stimated cost for the overhaul $100.000. The overhoved machine will be deprecated on wright line depreciation with me selvage value. The overhaul will move the machine's operating efficiency primately 10% to oth of year 34 d 5. Neathe perating conditions will be affected by the over Poberi 1010k saling for $240.000. Installing tingratorging and training will the $20.000. The manufacturer la willing to take the heavila strade-in for 330.000 The Robes will be degreed another line method will nevege value. New technology mostly wil make strani ste te the firm in 5 years Variable beating anferthermochine is the same $11 per machine hou cah-band Other pertinent dan WHICH STAHL MISLI MIR MARIA RENAME MAI GIMTAMINEN Devine natrumeni center vighted average cost of cha WACC) a Bandhan the 40% tax brakes as the DV factor for calculating the Novofcodexo tematie the WWW WIS The management of Cewe Harument Carrey is considering the purchase of a new drilling machine model ari 1000K. According to the profiteraard word dit v D-1X10, the machine Devine is currently ang The Arena orada yange for $20.000 are a being deprecated and the righ-line method avere ur rete tent or extmed vape 520.000 The engineering that so going for the 3 years after a major overhaul at the end of its expected actul life. The stimated cost for the averhaul a $100.000. Thesverhauled machine No other perang terhube affected by the ever had Deboril 10106 assinater 534000.htine, teine engine and valing will cost the $20.000 The manufacturer willing to take the formare 330.000 The bear the tregtimetrodNew technology most likely will make Reberlebaclete to the firm in 5 years Varable aperating cele machines the same $11 ber machine hour bases Other pertinent data folen 1 bespree ALLOW1 19.0 8.00 S 100 Robot 1010 10,000 4.00 $ Units of our Machin huis Solling prior Variable at cash-based (not including machines Other an holl and supervising Disposal and Disposal values $ 20 $40,00 2e Xe, $25,000 S $50,00 Devine Instument Company's weighted average cost of capital WACC) 228 and it in the 40% tax bracket Vas the PV fotonapenex C Teleste celelating the NPV of each dessen eternative Suey Tegelen B S 21x88x C Get Homework Help With Chegg X + Hect_Production/bne/accounting/blocher_8e/Appendix_C_Table_1.jpg LE 1 Present Value of $1 12% eriods 45 5% 6% 79 8% 99 10% 11% 13% 14% 15% 20% 25% 30% 1 0.962 0.952 0.943 0.935 0.926 0917 0.909 0.901 0.893 0.SS5 0.877 0.870 0.333 0.500 0.769 2. 0.925 0.907 0.590 0.873 0.357 0.542 0.526 0.12 0.797 0.783 0.769 0.756 0.694 0.640 0.592 3 0.899 0.364 0.540 0.816 0.794 0.772 0.751 0.731 0.712 0.693 0.675 0.658 0.579 0.512 0.455 4 0.855 0.823 0.792 0.763 0.735 0.70 0.683 0.659 0.636 0.613 0.592 0.572 0.482 0.410 0.350 5 0.822 0.750 0.747 0.713 0.651 0.650 0.621 0.593 0.567 0.543 0.519 0.497 0.402 0.329 0.269 6 0.790 0.746 0.705 0.666 0.630 0.596 0.564 0.535 0.507 0.450 0.456 0.432 0.335 0.262 0.207 7 0.760 0.711 0.665 0.623 0.533 0.547 0.513 0.432 0.452 0.425 0.400 0.376 0.279 0.210 0.159 S 0.731 0.677 0.627 0.582 0.540 0.502 0.467 0.434 0.404 0.376 0.351 0.327 0.233 0.165 0.123 9 0.703 0.645 0.592 0.544 0.500 0.460 0.424 0.391 0.361 0.333 0.305 0.284 0.194 0.134 0.094 10 0.676 0.614 0.558 0.505 0.463 0.422 0.356 0.352 0.322 0.295 0.270 0.247 0.162 0.107 0.073 0.650 0.585 0.527 0.475 0.429 0.333 0.350 0.317 0.287 0.261 0.237 0.215 0.135 0.036 0.056 12 0.625 0.557 0.497 0.444 0.397 0.356 0.319 0.286 0.257 0.231 0.205 0187 0.112 0.069 0.043 13 0.601 0.530 0.469 0.415 0.365 0.326 0.290 0.25% 0.229 0.204 0.182 0.163 0.093 0055 0.033 14 0.577 0.505 0.442 0.385 0.340 0.299 0.263 0.232 0.205 0.151 0.160 0.141 0.078 0.044 0.025 15 0.555 0.451 0.417 0.362 0.315 0.275 0.239 0.209 0.183 0.160 0.140 0.123 0.065 0.035 0.020 16 0.534 0.458 0.394 0.339 0.292 0.252 0.215 0.1SS 0.163 0.141 0.123 0.107 0.054 0.028 0.015 17 0.513 0.436 0.371 0.317 0.270 0.231 0.19 0.170 0.146 0.125 0 105 0093 0.045 0.023 0.012 18 0.494 0.416 0.350 0.296 0.250 0.212 0.180 0.153 0.130 0111 0.095 O OSI 0.038 0.018 0.009 19 0.475 0.396 0.331 0.277 0.232 0.194 0.164 0.13 0.116 0.098 0.083 0.070 0.031 0.014 0.007 20 0.456 0.377 0.312 0.258 0.215 0.178 0.149 0.124 0.104 0.087 0.073 0.061 0.026 0.012 0.005 22 0.422 0.342 0.278 0.226 0.184 0.150 0.123 0.101 0.083 0.06 0.056 0.046 0.014 0.007 0.003 24 0.390 0.310 0.247 0.197 0.158 0.126 0.102 0.082 0.066 0.053 0.043 0.035 0.013 0.005 0.002 25 0.375 0.295 0.233 0.184 0.146 0.116 0.092 0.074 0.059 0.047 0.035 0.030 0,010 0.004 0.001 30 0.308 0.231 0.174 0.131 0.099 0.075 0.057 0.044 0.033 0.026 0.020 0,015 0.004 0.001 0.000 35 0.253 0.151 0.130 0.094 0.06 0.049 0.036 0.026 0.019 0.014 0.010 0.00 0.002 0.000 0.000 40 0.205 0.142 0.097 0.067 0.046 0.032 0.022 0.015 0.011 0.008 0.005 0.004 0.001 0.000 0.000 0231 019 Note: The present value (PV) factor for N periods and rater per period = 1+(1+r)" For example, the PV factor for 10%, 5 years = 1 +(1+0.103* = 0.621 (rounded) w O a 110 18 f9 17 16 + 08 * 7. 9 6 O 8 2 1/4 12 a
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
