Question: DRILLING ENGINEERING Question 2: (11 marks) a. Based on the International Association of Drilling Contractor guideline, describe the 7-3-7 bit. b. A 1.02 specific gravity

DRILLING ENGINEERING

Question 2: (11 marks)

a. Based on the International Association of Drilling Contractor guideline, describe the 7-3-7 bit.

b. A 1.02 specific gravity brine mud will be used to drill 8 5/8 shaly sandstone hole section from 7,000 to 8,500 ft depth using 700 bbls mud with 50 psig overbalanced. If the formation pressure gradient from 7,000 7,800 ft depth is 0.47 psig/ft after which decreased to 0.45 psig/ft down to 8,500 ft depth, what the drillers need to do so that the drilling operation will be smoothly and safely running. Include related calculation in your answer.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!