Question: During the design process, work activities with resource utilization rate above 100% should be prioritized over those with resource utilization rate less than 100%. a)

 During the design process, work activities with resource utilization rate above

During the design process, work activities with resource utilization rate above 100% should be prioritized over those with resource utilization rate less than 100%. a) True b) False