Question: E . Preliminary Treatment: E . 1 . An aerated grit chamber is designed for a WWTP receiving an average daily flow of 1 0

E. Preliminary Treatment:
E.1. An aerated grit chamber is designed for a WWTP receiving
an average daily flow of 10 MGD. Assume two grit chambers
operate in parallel with a detention time of 5 minutes at peak
flow. The peak hour flow is three times the daily average. Use
the design criteria provided in your textbook in Table 7.8
(page 344) to determine the length, width, and depth in feet.
Constraints at the plant require minimized tank depth and
length to width ratio.