Question: e) Using the Critical Ratio (CR) scheduling rule for sequencing the jobs, the order is: Sequence Job 1 C D A B 2 A D
e) Using the Critical Ratio (CR) scheduling rule for sequencing the jobs, the order is:
| Sequence | Job |
| 1 | C D A B |
| 2 | A D B C |
| 3 | D C B A |
| 4 | C D B A |
The average tardiness (job lateness) for the sequence developed using the CR rule = ___ days (round your response to two decimal places).
The average completion time (flow time) for the sequence developed using the CR rule = ____ days (round your response to two decimal places).
The percentage utilization for the sequence developed using the CR rule = _____
(enter your response as a percentage rounded to two decimal places).