Question: E4-9 Compute overhead rates and assign overhead using ABC, (LO 2,3), AP Air United, Inc. manufactures two products: missile range instruments and space pressure gauges.

 E4-9 Compute overhead rates and assign overhead using ABC, (LO 2,3),
AP Air United, Inc. manufactures two products: missile range instruments and space

E4-9 Compute overhead rates and assign overhead using ABC, (LO 2,3), AP Air United, Inc. manufactures two products: missile range instruments and space pressure gauges. During April, 50 range instruments and 300 pressure gauges were produced, and overhead costs of $94,500 were estimated. An analysis of estimated The cost driver Volume for each product was as follows. instructions (a) Determine the overhead rate for each activity. (b) Assign the manufacturing overhead costs for April to the two products using activity-based costing. (c) Write a memorandum to the president of Air United explaining the benefits of activity-based costing. E4-1 Assign overhead using traditional costing and ABC. (LO 1, 2), AP Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plant wide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company's operations. Total estimated overhead costs are $240,000. Overhead cost allocated to the machining activity cost pool is $140,000, and $100,000 is allocated to the machine setup activity cost pool. Instructions (a) Compute the overhead rate using the traditional (plant wide) approach. (b) Compute the overhead rates using the activity-based costing approach. (c) Determine the difference in allocation between the two approaches. E4-9 Compute overhead rates and assign overhead using ABC, (LO 2,3), AP Air United, Inc. manufactures two products: missile range instruments and space pressure gauges. During April, 50 range instruments and 300 pressure gauges were produced, and overhead costs of $94,500 were estimated. An analysis of estimated The cost driver Volume for each product was as follows. instructions (a) Determine the overhead rate for each activity. (b) Assign the manufacturing overhead costs for April to the two products using activity-based costing. (c) Write a memorandum to the president of Air United explaining the benefits of activity-based costing. E4-1 Assign overhead using traditional costing and ABC. (LO 1, 2), AP Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plant wide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company's operations. Total estimated overhead costs are $240,000. Overhead cost allocated to the machining activity cost pool is $140,000, and $100,000 is allocated to the machine setup activity cost pool. Instructions (a) Compute the overhead rate using the traditional (plant wide) approach. (b) Compute the overhead rates using the activity-based costing approach. (c) Determine the difference in allocation between the two approaches

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!