Question: EC 521 CONSTRUCTION PROJECT MANAGEMENT Group Assignment No.1 2021/2022 Academic Year Question 1 Discuss the concept of experience contractor as described in many general conditions

EC 521 CONSTRUCTION PROJECT MANAGEMENT Group

EC 521 CONSTRUCTION PROJECT MANAGEMENT Group Assignment No.1 2021/2022 Academic Year Question 1 Discuss the concept of "experience contractor" as described in many general conditions of contract. Do you think such a person (physical or legal) exists and how would you show this one way or the other? [20] Question 2 a) Suggest some examples where "temporary protection of works" should not be confused with "covering up or putting out of view". [10] b) A loaded petrol tanker swerves into the site and explodes, causing damage to the works, because the driver was watching a meteorite in the sky. Who do you think should be held responsible for this incident? Explain your answer and suggest how the costs would be handled. [20] Question 3 a) Find the direct cost estimate for a 1.5m shallow excavation to connect a sewer pipe into an existing reticulation. Work will have to be done by hand due the restricted nature of the excavation and proximity of the existing pipe. If the soil type is clay and a double handling allowance of Thr/m is likely, calculate the rate per m3 iflabor costs K60.00/hr all-in. (You are free to make necessary assumptions based on best practice and references). [20] b) The rate required for excavating top soil, average depth 300mm over the area on which a culvert is to be constructed. The top soil will be pushed into heaps and used to cover the embankments once the culvert is completed. The culvert is part of the larger road contract and there is likely to be a small bulldozer available at the time which it is decided will be used for this pricing exercise. There is about 60m3 of work to be done according to the bill of quantities which would make its usage economical. Calculate the direct cost estimate if the bulldozer costs K850.00/hr all-in and one laborer required to assist costs K60.00/hr all-in. (You are free to make necessary assumptions based on best practice and references) [30] NB: Well researched and properly referenced work will attract maximum points! Assignment due: Tuesday, 3rd Week of the 2nd Term. Late assignments will not be accepted

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!