Question: ECE 5 4 1 3 SHALLOW AND DEEP FOUNDATION DESIGN Proiect Description: LTU plans to build a new multi - use laboratory building on -
ECE SHALLOW AND DEEP FOUNDATION DESIGN
Proiect Description:
LTU plans to build a new multiuse laboratory building oncampus. The column layout for part of the building is shown in Figure Three cone penetration tests and three exploratory borings have shown in Figure and Figure The laboratory building columns are subjected to design load ranges from kips to kips and service loads range from kips to kips The ground water level is observed from the exploration borings at ft from the ground surface.
A preliminary design shows that shallow foundation won't meet the serviceability limit state requirements. Therefore, concrete driven piles without predrilling and jetting are considered to be configurations: single pile or a pile group with pile matrix you mays the feasibility of two pile if needed Using ASD method with and the data provided, determine the pile configuration for single pile: length, embedment depth; for pile group: depth, pile matrix and the expected settlement to support the downward design column load. Concrete piles of averag diameter ft and average length of ft are readily available. The concrete has and Based on your calculations, please provide and curves for the pile head, you should allow for a ft cutout from the pile head. What is the settlement of the pile and pile group
ECE SHALLOW AND DEEP FOUNDATION DESIGN
tableDepth ftDeposit,Soil Test Results to Sand,
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock