Question: electric bike Work breakdown structure (WBS) divides the project into recognisable tasks and activities at different levels - Level 1: Project 25-Sep-20 6 - Level

electric bike
Work breakdown structure (WBS) divides the project into recognisable tasks and activities at different levels
- Level 1: Project
25-Sep-20
6
- Level 2: - Level 3: - Level 4:
Major tasks in the project Subtasks in the major tasks
Activities to be completed (work packages)
 electric bike Work breakdown structure (WBS) divides the project into recognisable

Generate a Work Breakdown Structure (WBS) for your project, similar to the example shown below 1.0 Trailer Design and Production 1.1 1.3 Project Planning 1.2 Project Development Project Close 1.2.1 1.1.1 Define design requirements 1.1.2 Select bought in components Frame Design 1.2.2 Trailer Design 1.2.3 Assemble &Test 1.3.1 Set up production line 1.3.2 Build 1st off batch 1.2.1.1 1.2.1.2 1.2.2.1 Design Lab Test Compete frame frame trailer geometry geometry design 1.2.3.1 1.2.3.21 1.2.3.3 Field Assemble Lab Test trial prototype prototype prototype A WBS of Trailer Design and Production 25-Sep-20 7

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!