Question: Electric power is to be generated by installing a hydraulic turbine - generator at a site 7 0 m below the free surface of a
Electric power is to be generated by installing a hydraulic turbinegenerator at a site m below the free surface of a large water reservoir that can supply water at the rate of kgs steadily. Write the energy equation and using that equation calculate the maximum possible power output in kW If the power output of the turbine is kW and the electric power generation is kW determine the turbine efficiency and the combined turbinegenerator efficiency of this plant.