+ Element FF ID A iPhone Production Standards Work Element Decription Fixture and Secure the rear...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
+ Element FF ID A iPhone Production Standards Work Element Decription Fixture and Secure the rear case (base) JJ - B Install the Lightning plug connector assembly into the rear case (base) KK A C D E F G H J K Affix (fasten) the lightning connector assembly; 4 screws Install the Power Button Install 3 side buttons (Mute switch and volume controls) Install the Power & Volume button flex cable assembly Prepare the Wifi antenna assy Install and fasten Blue tooth antenna PCBA ass Secure/affix wifi and Bluetooth assemblies with metal bracket install the taptic engine (vibrations & sensory motor) and secure the metal bracket B LL C C MM Precedence GG HH D, E.K G 00 H F L M connect the side buttons to the power & volume flex cable secure the button and cable assembly with 2 metal brackets and screws F L N P Install the rear facing camera assembly (includes flex cable) Install the front facing & infrared camera assembly (includes flex cable) Install upper speaker assembly M J J Q Quality check! Ensure proper fastening & function of the side buttons, toggle, Power, Vibration) R S T U V W X Y N Prepare the SIM card tray and ejection mechanism/assembly Install Logic board PCBA_1 install Logic Board PCBA_2 Connect the rear facing camera flex cable to PCBA_1 Connect the front facing camera with infrared camera assembly and IR flex cable to PCBA_2 Connect the power switch/volume flex cable to PCBA_1 Secure all cable connections with fasteners LCD screen & digitizer assembly is prepared by removing protective foils and attaching LCD to the digitizer via 4 screws Attach and Secure (with 2 screws) the home button assembly within the LCD screen frame (hole provided). L.M,N,Q R R S T S U,V,W AA BB Install front facing camera's flex cable assembly Install microphone and bottom speaker assembly and secure with metal bracket + 3 screws Y AA CC DD EE Battery & Charging coil assembly is prepared by applying double-sided adhesive strip to both the battery assembly and the charging coil assembly. Install (adhere) the charging coil onto the battery pack Adhere the battery/coil assembly into the case (base) by press/hold allowing the adhesive to settle. - CC DD Connect the LCD screen to the logic boards_PCBA 1/2 & secure with metal plates (2 plates) (6 screws) Connect the home button flex cable to the logic board PCBA insert waterproofing gaskets Press/insert SIM card tray into side location of base/case Snap-press together the base/case and LCD assembly to become an enclosed/finished assembly Z, BB, EE FF GG O,P,X,HH JJ Secure the overall assembly with 2 screws in the lower end of the base/case assembly KK Power up and test/inspect functionality of: screen touch activation, sounds, antennas, location services, swiping & setting of app preferences, battery health, cameras, utilities, and calling (send/receive), 360 Visual Check Place phone into the fibreboard crate for transit to packaging depot (3rd party packager) LL MM 2. Precedence Diagram Complete the construction of the precedence diagram based on the data provided in your group's data file. + Element FF ID A iPhone Production Standards Work Element Decription Fixture and Secure the rear case (base) JJ - B Install the Lightning plug connector assembly into the rear case (base) KK A C D E F G H J K Affix (fasten) the lightning connector assembly; 4 screws Install the Power Button Install 3 side buttons (Mute switch and volume controls) Install the Power & Volume button flex cable assembly Prepare the Wifi antenna assy Install and fasten Blue tooth antenna PCBA ass Secure/affix wifi and Bluetooth assemblies with metal bracket install the taptic engine (vibrations & sensory motor) and secure the metal bracket B LL C C MM Precedence GG HH D, E.K G 00 H F L M connect the side buttons to the power & volume flex cable secure the button and cable assembly with 2 metal brackets and screws F L N P Install the rear facing camera assembly (includes flex cable) Install the front facing & infrared camera assembly (includes flex cable) Install upper speaker assembly M J J Q Quality check! Ensure proper fastening & function of the side buttons, toggle, Power, Vibration) R S T U V W X Y N Prepare the SIM card tray and ejection mechanism/assembly Install Logic board PCBA_1 install Logic Board PCBA_2 Connect the rear facing camera flex cable to PCBA_1 Connect the front facing camera with infrared camera assembly and IR flex cable to PCBA_2 Connect the power switch/volume flex cable to PCBA_1 Secure all cable connections with fasteners LCD screen & digitizer assembly is prepared by removing protective foils and attaching LCD to the digitizer via 4 screws Attach and Secure (with 2 screws) the home button assembly within the LCD screen frame (hole provided). L.M,N,Q R R S T S U,V,W AA BB Install front facing camera's flex cable assembly Install microphone and bottom speaker assembly and secure with metal bracket + 3 screws Y AA CC DD EE Battery & Charging coil assembly is prepared by applying double-sided adhesive strip to both the battery assembly and the charging coil assembly. Install (adhere) the charging coil onto the battery pack Adhere the battery/coil assembly into the case (base) by press/hold allowing the adhesive to settle. - CC DD Connect the LCD screen to the logic boards_PCBA 1/2 & secure with metal plates (2 plates) (6 screws) Connect the home button flex cable to the logic board PCBA insert waterproofing gaskets Press/insert SIM card tray into side location of base/case Snap-press together the base/case and LCD assembly to become an enclosed/finished assembly Z, BB, EE FF GG O,P,X,HH JJ Secure the overall assembly with 2 screws in the lower end of the base/case assembly KK Power up and test/inspect functionality of: screen touch activation, sounds, antennas, location services, swiping & setting of app preferences, battery health, cameras, utilities, and calling (send/receive), 360 Visual Check Place phone into the fibreboard crate for transit to packaging depot (3rd party packager) LL MM 2. Precedence Diagram Complete the construction of the precedence diagram based on the data provided in your group's data file.
Expert Answer:
Posted Date:
Students also viewed these general management questions
-
List the fish and invertebrates you selected after the nitrogen cycling process?
-
Hard Top Patios issued $225,000 worth of five-year bonds with a stated interest rate of 9.5% and interest payable annually on December 31. The bonds were issued at 95. The bonds were issued on...
-
A singly ionized helium atom (He+) has only one electron in orbit about the nucleus. What is the radius of the ion when it is in the second excited state?
-
Use the plant asset record from Application Problem 8-1. Using the straight-line method, complete a depreciation table for each of the plant assets bought by Mannings, Inc. Data from Problem 8-1...
-
Cougar, Inc., is a calendar year S corporation. Cougars Form 1120S shows nonseparately stated ordinary income of $80,000 for the year. Johnny owns 40% of the Cougar stock throughout the year. The...
-
Immigration reform has focused on dividing illegal immigrants into two groups: long-term and short-term. In a random sample of 844 construction workers from the Northeast, 56 are illegal short-term...
-
The FEL is a dietary guide that groups foods in terms of equivalent amounts of carbohydrates, protein, fat and energy. Hence, food in any group may be "exchanged" with other food in the same list or...
-
Can you give me the target markets of these sports nutrition companies in canada such as: Nutraphase, MuscleTech, Blue star neutraceutical, bpi sports, optimum nutrition, iovate health sciences ....
-
The accountant for Benson's Dress Shop prepared the following cash budget. Benson's desires to maintain a cash balance of $17,000 at the end of each month. Funds are assumed to be borrowed and repaid...
-
Consider the following system, where a, b, and d are constants. ) _dU(x,t) _ aU(x,t)+bV(x,t) ox JU(x,t) at av (x.t) _ qV(x,t) _ bv(x,t) at dx Then consider the values of the initial and boundary...
-
Two + 3 . 0 nC charges are 1 0 m from each other. What is the electric potential energy of this system of particles?
-
Can you provide examples of successful stakeholder engagement in public-sector organizations?
-
Find the probability that a particle in a box L wide can be found between x=0 and x=L/n when it is in the n-th state.
-
What is your assessment of the negotiations process, given what you have studied? What are your recommendations for Mr. Reed? You must justify your conclusions
Study smarter with the SolutionInn App