Question: Engineering cost estimates are usually based on operating conditions that are considered: Multiple Choice O optimal O practical O attainable. historical Saved When there is

Engineering cost estimates are usually based on operating conditions that are considered: Multiple Choice O optimal O practical O attainable. historical Saved When there is a production constraint, a company should emphasize the products with: Multiple Choice O the highest unit contribution margins the highest contribution margin ratios. the highest contribution margin per unit of the constrained resource. the highest contribution margins and contribution margin ratios