Question: engineering management Question 3 1 pts Figure below presents the variation of inventory level over time for a particular inventory item. In the figure below

engineering management

engineering management Question 3 1 pts Figure

Question 3 1 pts Figure below presents the variation of inventory level over time for a particular inventory item. In the figure below Q = 1,352 units and T = 20 days. Inventry Level vs Time Inventory units N Teme de REQUIRED: If the lead time is 2 days, determine the value of the Reorder Point (ROP) in units Useful information: the demand rate can be determined using the information presented in the figure. Important Instruction: Round your answer to the next highest integer