Question: Engineering technologists use statistical information and control charts to track their performance on a variety of indicators. Recently one engineering technologist manager was asked whether

Engineering technologists use statistical information and control charts to track their performance on a variety of indicators. Recently one engineering technologist manager was asked whether their team is capable of maintaining scores between 8 and 10 (on a scale of 1 to 10, with 10 being the highest level) for "overall professionalism." The most recent data has a mean of 8.624, a standard deviation of 1.446, and n = 10.

Determine and share: Cp , Cpk and Interpret the indices