Question: ept Overview Required information Activity Level Examples of Activity Activity Driver (Measure) Unit level Batch level Product level Cutting parts Assembling components Printing checks Calibrating
ept Overview Required information Activity Level Examples of Activity Activity Driver (Measure) Unit level Batch level Product level Cutting parts Assembling components Printing checks Calibrating machines Receiving shipments Sampling product quality Recycling hazardous aste Designing molific on Organizing proactie Controlling Inventory Cleaning workplace Providing electricity Providing personnel support Reducing greenhouse gas emissions Machine hours Direct labor hours Number of checks Number of batches Number of orders Number of lots produced Tons recycled Change requests Engineering hours Parts per product Square feet of floors* Kilowatt hours Number of employees Tons of CO2 Facility level Facility-level costs are not traceable to individual product lines, batches, or units. They are normally assigned to units using a unit-level driver such as direct labor hours or machine hours even though they are caused by another activity. Knowledge Check 01 Select the type of activity from the drop down list. Items Item #1 Item #2 Item #3 Item #4 Recycling hazardous waste Cleaning workplace Assembling components Controlling inventory
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
