Question: Equation sheet. Make sure units are as asked in a question. V = L A 1 + A 2 2 Grade in % : (
Equation sheet. Make sure units are as asked in a question.
Grade in : vertical distance divided by horizontal distance
Swell factor swell percentage ; loose volume le Icy bank volume swell Factor
Shrink factor shrink : compacted volume bank volume shrink factor
Ideal dozer production, in loose cubic yards per hour Icyhr: Blade capacity minhrMT LT RT where MT is maneuver time, LT is loaded time, and RT is return time, in minutes
Efficiency: Factor between and if in divide by to use with a formula. Could be expressed in minutes out of a total of minutes per hour, or given as a or already as a factor.
Real dozer production, adjusted for efficiency Ideal dozer production Efficiency
Total production cost Owner and Operation cost Wage cost
Equivalent grade from rolling resistance:
Grade G; in Rolling resistance in IbUS tonlbUS ton
Effective grade Grade resistance rolling resistance
Conversions: ;;;; mile hour minutes, minute seconds, hour seconds
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock