Question: Estimated Cost Driver Level The controller for the Alabama Co, established the following overhead cost pools and cost drivers Budgeted Overhead Cost Pool Overhead Cost
Estimated Cost Driver Level The controller for the Alabama Co, established the following overhead cost pools and cost drivers Budgeted Overhead Cost Pool Overhead Cost Driver Quality controls $800,000 # of inspections Machine setups $900,000 # of setups Other overhead costs $800,000 # of machine hrs Total overhead costa $2,500,000 20,000 inspections 18,000 Setups 40,000 machine hrs A recent order for sailboats used: Quality inspections Machine setups Machine hours (MH) 1,300 Inspections 500 setups 2,500 machine hours Required: a) What is the overhead rate per machine hour if the number of machine hours (MH) is used as a single cost driver under traditional costing system? b) Utilizing traditional costing, how much overhead is assigned to the order based on machine hours as a single cost driver? c) Utilizing activity-based costing, how much overhead is assigned to the order? d) What causes the difference in costs between two system. Explain
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
