Question: Estimating & Specifications PROFESSORS: PATRICK REDKO - ROBERT ROY Assignment: A 1 * - Stripping & Excavation Due - week 3 ( see B b
Estimating & Specifications
PROFESSORS: PATRICK REDKO ROBERT ROY
Assignment:
A Stripping & Excavation
Due week see for due datetime
Instructions:
Each student is to individually complete manual
calculations. Include all manual calculationssketches
images saved as PNG Use filename:
AEC A calculation student name
pagepng each student to submit
As a group, setup one Excel spreadsheet with new tab
#G#Awhere # is replaced by section and your group
no Save file to include
AEC# G# A# Student last
names.xlsx
Each week take turns to summarize your individual findings
into the Excel spreadsheet. One summary only each week.
Summary based on handout Instructions for Assignments.
Highlight Excel page and print to fit one page Print to
Microsoft to PDF
NOTE: Groups to compile one submission as follows:
Excel File with estimate summary
Pdf version of estimate summary
student submissions png or pdf
NOTE: If you need to submit again ALL items must be
included in the submission last submission will ONLY be
marked. Items that were previously submitted will NOT be
marked.
NOTE: All rough work should be posed. A photo of your
work is acceptable.
NOTE: Save file to your Shared Group Drive. Each
assignment will use the existing file and include previous
Excel summary sheets. Work will not be marked from
Group drive it is for student use only.
NOTE: Plagiarism of any kind will NOT be accepted.
NO LATE SUBMISSIONS WILL BE ACCEPTED as per
industry standards in Estimating and Tendering.
Estimate Information:
Using the House Plans provided and given that:
Dimension B from lecture notes between outside of
footing and bottom of the excavation slope is
Soil slope for the house and garage excavations is :
Topsoil on the side is assumed to be thick.
One dump truck carries of topsoil.
Topsoil to be stripped and stockpiled on site for later use.
New material will be brought in for backfilling around the
foundation to use compaction faction
Excavated materials that need to be trucked away will use
a compaction factor of
Topsoil required around the building's perimeter will use a
compaction factor of
Calculate the following:
PERIMETER AND AREA: Determine the perimeter and
area of the building including the garage. Use outside wall
dimensions
STRIPPED AND STOCKPILED: Determine cubic yards of
topsoil to be stripped and stockpiled. Topsoil must be
removed to allow construction of the house, sidewalks, and
driveway.
EXCAVATED SOIL: Determine cubic yards of soil
excavated for the foundation and basement construction.
Don't forget the swell factor.
TRUCKLOADS: Determine the number of truckloads
required to remove the soil excavated for foundation and
basement construction.
BACKFILL: Determine the cubic yards of new backilling
that would be required to be brought to the site around the
perimeter of the building.
TRUCKLOADS: Determine the number of trucks of new
topsoil required.
REVISED MAY.
Professionalism:
Students should be able to demonstrate a
professional attitude and behavior toward their
work, their fellow students, and their instructor.
Reliability, respect for and cooperation with
colleagues, willingness to work calmly, and
courteously under difficult conditions, determination
to achieve firstclass work while meeting deadlines,
respect for equipment and systems, and
constructive response to criticism will be expected.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock