Question: Estimation, Costing and Valuation 1 . a ) Using the centreline method, prepare a detailed quantity estimate of a building from the given plan and

Estimation, Costing and Valuation
1. a) Using the centreline method, prepare a detailed quantity estimate of a building from the given
plan and cross-section, as shown in the figures.
b) Also, estimate the cost for the following items of work according to the schedule of rates provided in the table below.
i) Earthwork in excavation in the foundation, ii) Lime concrete inS the foundation, iii) Brickwork in the foundation and plinth, and iv) Brickwork in the superstructure.\table[[SI,Description of Item,Units,\table[[Rate],[Rs. P.]]],[1,\table[[Earthwork in the excavation of foundation trenched in any],[kind of soil, including trimming the side of trenches,],[leveling, dressing, and ramming the bottom.]],Cu m,8625.00],[2,\table[[Lime concrete with stone lime, surki, and over-burnt brick],[ballast i.e., Jhama metal (18:36:100) in the foundation]],Cu m,1450.00],[3,\table[[1^(nh ) class brickwork with cement mortar (1:4) in foundation],[and plinth]],Cu m,6590.50],[4,\table[[1^(n ) class brickwork with cement mortar (1:6) in the],[superstructure, including the cost of scaffolding ground floor]],Cu m,3115.50]]
Note: Tabulate the estimated quantities and cost of different portions of the building in the form of a table.
SECTIONAB
SOLVE BY HAND
Estimation, Costing and Valuation 1 . a ) Using

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!