Question: Example 1 1 An overpass is being built over the PVI of an existing equaltangent sag curve. The sag curve has a 7 0 -

Example 11
An overpass is being built over the PVI of an existing equaltangent sag curve. The sag curve has a 70-mih design speed, and G1=-6%,G2=+3%.
Determine the minimum necessary clearance height of the overpass, and the resultant elevation of the bottom of the overpass over the PVI. (Ignore the cross-sectional width of the overpass.)
Example 1 1 An overpass is being built over the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!