Question: Example 1 2 . 1 Design guide bunds ( or banks ) and launching apron required to be provided for a bridge across a river

Example 12.1 Design guide bunds (or banks) and launching apron required to be provided for a bridge across a river whose total waterway is 658.88 m. The design flood discharge is 13100 m^3/s which may be increased by 20% for the design of launching apron. Mean size of the river bed material is 0.3 mm.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock