Question: Example 4 . 1 1 . The reservoir for a hydro - electric station is 2 3 0 m above the turbine house. The annual

Example 4.11. The reservoir for a hydro-electric station is 230 m above the turbine house. The
annual replenishment of the reservoir is 4510I0kg. What is the energy available at the generating
station bus-bars if the loss of head in the hydraulic system is 30 m and the overall efficiency of the
station is 85%? Also, calculate the diameter of the steel pipes needed if a maximum demand of 45
MW is to be supplied using two pipes.