Question: Example 4 . 2 : Estimation of Discharge Given Diameter and Head Loss A pipeline 1 0 k m long, 3 0 0 m m

Example 4.2: Estimation of Discharge Given Diameter and Head Loss
A pipeline 10km long, 300mm in diameter and with roughness size 0.03mm, conveys water from a reservoir (top water level 850m above datum) to a water treatment plant (inlet water level 700m above datum). Assuming that the reservoir remains full, estimate
the discharge, using the following methods:
(a) The Colebrook-White formula
(b) The Moody diagram
(c) The HRS charts
Note: Assume v=1.1310-6m2s.