Question: EXAMPLE 4 Consider a power system with two plants having incremental cost as I C 1 = 1 . 0 P 1 + 2 0
EXAMPLE
Consider a power system with two plants having incremental cost as
Loss coefficient matrix is given by
Find the optimum scheduling for a system load of MW