Question: EXAMPLE 4 Consider a power system with two plants having incremental cost as I C 1 = 1 . 0 P 1 + 2 0

EXAMPLE 4
Consider a power system with two plants having incremental cost as IC1=1.0P1+200RsMWh,IC2=1.0P2+150RsMWh
Loss coefficient matrix is given by ,B=[0.001-0.0005-0.00050.0024]
Find the optimum scheduling for a system load of 100 MW.
EXAMPLE 4 Consider a power system with two plants

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!