Question: Example 7 . 5 : The settlement analysis ( based on the assumption of the clay layer draining from top and bottom surfaces ) for

Example 7.5: The settlement analysis (based on the assumption of the clay layer draining
from top and bottom surfaces) for a proposed structure shows 2.5 cm of settlement in four
years and an ultimate settlement of 10 cm . However, detailed sub-surface investigation re-
veals that there will be no drainage at the bottom. For this situation, determine the ultimate
settlement and the time required for 2.5 cm settlement.