Question: EXAMPLE No . 2 :With a 4 5 min - hr efficiency what is the best probable production in Icy / hr for a 2

EXAMPLE No.2:With a 45 min-hr efficiency what is the best probable production in Icy/hr for a 2% cy long stick hoe excavating wet gravel? The average depth of excavation is 12 It and the angle of Swing is 35. Then Convert the production to tons per hour