Question: Exercise 1 The following system specification with 4 tasks T 1 , . . . , T 4 is given: The tasks can be executed

Exercise 1 The following system specification with 4 tasks T1,..., T4 is given: The tasks can be executed on different hardware units. The following table shows these units and the according costs and execution times. exec. time (ms) unit cost /unit T1 T2 T3 T4 MIPS 20052 DSP 12020185 FPGA 2401210 ASIC 400(a) Assume that every hardware unit can be used at most 1 time. Note the design space by listing all possible Design Points. A design point is a set of allocation, binding and scheduling (b) Determine the costs and the execution times of all design points. (c) Draw the design point to a cost / execution-time diagram and mark the Pareto Points. (d) Are there new design points, if each hardware unit can be used more than just 1 time? (e) How many design points exist at least, if a task graph with a tasks is arbitrary mapped to a system with at least 3 hardware units?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!