Question: Exercise 2-12 Computing Predetermined Overhead Rates and Job Costs [LO1, LO2, LO3, LO7] Kody Corporation uses a job-order costing system with a plantwide overhead rate
Exercise 2-12 Computing Predetermined Overhead Rates and Job Costs [LO1, LO2, LO3, LO7]
Kody Corporation uses a job-order costing system with a plantwide overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: |
| Machine-hours required to support estimated production | 152,000 | |
| Fixed manufacturing overhead cost | $ | 655,000 |
| Variable manufacturing overhead cost per machine-hour | $ | 4.30 |
| Required: |
| 1. | Compute the predetermined overhead rate. (Round your answer to 2 decimal places.) |
| Predetermined overhead rate | $ per MH | |
| 2. | During the year Job 500 was started and completed. The following information was available with respect to this job: |
| Direct materials requisitioned | $ | 370 |
| Direct labor cost | $ | 250 |
| Machine-hours used | 31 | |
Compute the total manufacturing cost assigned to Job 500. (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount.) |
| Total manufacturing cost | $ |
| 3-a. | During the year the company worked a total of 146,000 machine-hours on all jobs and incurred actual manufacturing overhead costs of $1,261,060. What is the amount of underapplied or overapplied overhead for the year? (Input the amount as a positive value. Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount.) |
| Manufacturing overhead cost by | $ |
| 3-b. | If this amount were closed out entirely to Cost of Goods Sold, would the journal entry increase or decrease net operating income? | ||||
|