Question: Exercise .. 57.15 A production process at Kenneth Day Manufacturing is shown in Figure S7.9. The drilling operation occurs separately from. and simultaneously with, sawing

Exercise .. 57.15 A production process at Kenneth Day Manufacturing is shown in Figure S7.9. The drilling operation occurs separately from. and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). a) Which operation is the bottleneck? b) What is the bottleneck time? c) What is the throughput time of the overall system? d) If the firm operates 8 hours per day, 20 days per month, what is the monthly capacity of the manufacturing process? Sawing 6 units/hr Sanding 6 units/hr Assembly 0.7 units/hr Welding 2 units/hr Assembly 0.7 units/hr Drilling 24 units/hr Assembly 0.7 units/hr Figure S7.9 S7 - 73
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
