Question: EXERCISESConsider a manufacturing system comprising two different machines and a single operator who is shared between the two machines. Parts arrive with an exponen -
EXERCISESConsider a manufacturing system comprising two different machines and a single
operator who is shared between the two machines. Parts arrive with an exponen
tially distributed interarrival time with a mean of minutes. The arriving parts are
one of two types. Sixty percent of the arriving parts are Type and are processed
on Machine These parts require the operator for a oneminute setup operation.
The remaining percent are part Type and are processed on Machine These
parts require the operator for a minute setup operation. The service times ex
standard deviation of mire normally distributed with a mean of minutes and a
standard deviation of minute for Type parts and a mean of minutes and a
Two different priority minutes for Type parts.
between the two types of schemes have been proposed for allocating the operator
Type jobs. Under this proposal jobs. The first scheme is to assign priority to the
are no job Type setups waiting to bet setup will only be performed if there
to alternate the priority between to be performed. The second proposed scheme is
Simulate each of these system two job types.
machine, and the average flowtime for all parts.
Exercise
A manual car wash has five identical booths for which cars must wait in a single
queue. Cars arrive exponentially with a mean interarrival time of minutes. A per
son washes his car according to a normal distribution with mean of minutes and
a standard deviation of minutes. The car wash is open hours per day. Simulate
the system for a hour day and count the number of cars washed.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
