Question: Extra Problem: 1 . 7 . 1 1 1 Steel riser pipe hangs from a drill rig located offshore in deep water ( see figure
Extra Problem:
Steel riser pipe hangs from a drill rig located offshore in deep water see figure
Separate segments are joined using bolted flange plates see figure and photo
Assume that there are six bolts at each pipe segment connection. Assume that the
total length of riser pipe is ; outer and inner diameters are
; flange plate thickness is ; and bolt and washer diameters are
a If the entire length of the riser pipe were suspended in air, find the average
normal stress in each bolt, the average bearing stress beneath each washer, and
the average shear stress through the flange plate at each bolt location for the
topmost bolted connection.
b If the same riser pipe hangs from a drill rig at sea, what are the normal, bearing,
and shear stresses in the connection?
Obtain the weight densities of steel and sea water from Table Appendix I.
Neglect the effect of buoyant foam casings on the riser pipe
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock