Question: Factory Overhead Volume Variance Tip Top Corp. produced 2,900 units of product that required 1.5 standard hours per unit. The standard fixed overhead cost per
Factory Overhead Volume Variance Tip Top Corp. produced 2,900 units of product that required 1.5 standard hours per unit. The standard fixed overhead cost per unit is $0.986 per hour at 4,750 hours, which is 100% of normal capacity. Determine the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. $