Question: Factory real problem 0 1 - Re - do As the project engineer in a concrete block plant, you must determine the performance of a

Factory real problem 01- Re-do
As the project engineer in a concrete block plant, you must determine the performance of a centrifugal pump for installation in a factory section. The system into which the pump will be installed consists of suction and discharge pipes of length 21 m and 42 m , respectively; and diameters 300 mm and 240 mm, respectively. The pump rums at 1800 revimin and provides a total vertical lift of 12 m , and losses due to strainers and pipe bends may be neglected. The friction factor is 0.009. The pump manufacturer supplies the following performance data:
\table[[Q(m'sec),0,00,0,10,0,15,0,20,0,25,0,30],[Hrcq(m),40,37,34,29,5,24,5,17,5],[,0,68,77,76,66,45],[Hgr(m),12,14,07,16,66,20,29,24,95,30,65]]
Determine the system head equation for the factory:
Ting the erraph prosided, determina the potver required to ron the above pump.
Factory real problem 0 1 - Re - do As the project

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!