Question: facultative pond. [ 4 marks ] ( b ) A waste stabilization pond is designed for a residential estate of 2 5 , 0 0
facultative pond.
marks
b A waste stabilization pond is designed for a residential estate of persons each one
generating person per day of domestic wastewater. The plant consists of a
facultative pond and maturation pond s arranged in series. The depths of both ponds are
and the hydraulic retention time HRT of the maturation pond is days. The first
order BOD removal rate constant at is per day. The BOD of raw sewage is
the influent is and the operating temperature is
Determine:
i The area and hydraulic retention time HRT of the ficultative pond. marks
ii The number of maturation pond s required to achieve the eflluent FC of
iii The effluent BOD of the maturation pond.
marks
marks
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock