Question: Failure modes and effects analysis (FMEA) could be generated due to various reasons, among others, for a new design or process of new technology. FMEA

Failure modes and effects analysis (FMEA) could

Failure modes and effects analysis (FMEA) could be generated due to various reasons, among others, for a new design or process of new technology. FMEA could assist these activities in completing this new design or process. In the modification to the existing design, assuming that there is an FMEA for the existing design, FMEA could be generated with a focus on the modification to the design process, possible interactions due to the interaction, and field history. FMEA could also be generated on the existing design or process but in a new environment, location or application. (a) Calculate the Risk Priority Number (RPN) of each potential effect as stated in the FMEA sheet as shown in the following table. Potential Causes Process Step What is the step? Potential Failure Mode In what ways can the step go wrong? Potential SEV Failure Effect What is the How impact on the severe is customer if the the effect failure mode is on the not prevented or customer? corrected? What causes the How step to go wrong frequently (i.e., how could is the the failure mode cause occur)? likely to occur? Current Process DET RPN* Controls What are the exist- How Risk priority ing controls that probable is number either prevent the detection of calculated failure mode from the failure as SEV x occurring or detect mode or its | OCC x DET it should it occur? cause? 8 Unauthorized access Lost or stolen ATM card 3 3 . Unauthorized cash withdrawal Very dissatisfied customer Block ATM card after three failed authentication attempts ATM Pin Authentication Authentication failure Annoyed customer 3 Network failure 5 Install load balancer to distribute work- load across network links 5 Cash not disbursed Dissatisfied customer 7 ATM out of cash 7 Internal alert of low cash in ATM 4 Dispense Cash Account debited but no cash disbursed Very dissatisfied customer 8 Transaction failure Network issue 3 Install load balancer to distribute work- load across network links Extra cash dispensed Bank loses money 8 Bills stuck to each other Bills stacked incorrectly 2 Verification while loading cash in ATM 3 (10) (b) Based on obtained results from question a), discuss the possible solution of each possible effect. ( 10 )

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!