Question: fast send solution pls Soru 2 Head 15. indem Site A computer M2 has the following CPls for instruction types A thru D, and a
Soru 2 Head 15. indem Site A computer M2 has the following CPls for instruction types A thru D, and a program P3 has the following mix of instructions (Note: pct = percent): M2: Type A CPIA = 1.7 Type B CPIB = 2.1 Type C CPIC = 2.7 Type D CPID = 24 P3: Type A = 22 pct Type B = 29 pct Type C = 17 pct Type D = remaining pct a. Calculate the average CPI of Machine M2: b. Calculate the runtime of P3 on M2 if I = 22,311 and clock rate is 3.3 GHz www.BI-ESTE Kalan Sure 1 41:05
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
